I just have set up a long running XFAI program that starts in two days (2026-10-26).
The created plan looks good, containing lots of LIT at the start.
However, when I select a LIT entry (e.g. for 2026-10-27 with 99/0.0/0.0 XSS) to choose an actual workout, I get a XATA workout selection although the date lies within the XFAI program. Correspondingly the proposed workouts do not match the XFAI XSS goal of that day.
1 Like
Cheers. We’ll look into that.

