I’m using the release forecast and when I build a race plan with an race on the 17th of May, run the forecast and save it, it bumps the date back to the 16th. It’s done it every time.
I’ve seen this too but couldn’t come up with a pattern to it.
I was able to save the Program choice with the correct Target Date on some tests or when recasting with the same settings.
Yes seeing the same. My race date is a long way out so not an issue, but yes keeps shifting to day before.
Should be resolved. Can you confirm?
Can I ‘adapt plan’ without losing my starting point?
It kept my race date, but it seems to want to add weight to my target weight as well. In my case it’s a pound.
Can you kindly send a screenshot or two to support so we can get someone to look at it?
Looks like a rounding error going from kg to lbs. We’ll have a look.
Looks like you have a planned activity the nght before the event and XFAI isn’t able to correctly generate the taper week activities. We’ll add an error message that a plan can’t be created in this situation.
That planned activity was the actual event that I had put in there prior to race ai being launched. Have removed it and plan is generating again. Thanks