# Confused by XFAI setup: achievable goal, but no plan generated

**URL:** <https://forum.xertonline.com/t/confused-by-xfai-setup-achievable-goal-but-no-plan-generated/49232>\
**Category:** Training\
**Created:** [April 5, 2026, 8:37am UTC](https://forum.xertonline.com/t/confused-by-xfai-setup-achievable-goal-but-no-plan-generated/49232 "2026-04-05T08:37:07Z")\
**Posts on this page:** 1\
**Showing post:** 9

<div class="post-metadata">

**Author:** ![ridgerider2](https://forum.xertonline.com/user_avatar/forum.xertonline.com/ridgerider2/32/6522_2.png) [@ridgerider2](https://forum.xertonline.com/u/ridgerider2)\
**Post date:** [April 13, 2026, 2:57pm UTC](https://forum.xertonline.com/t/confused-by-xfai-setup-achievable-goal-but-no-plan-generated/49232/9 "2026-04-13T14:57:27Z")

</div>

Operating with a blank calendar and flexible hours on XATA is a LOT different than the nuanced XFAI plan with projected LIT/HIT/Rest days.  
I posted a chart outlining the differences in XATA vs XFAI here –  
[Onboarding steps for Xert trial users and newbies - General - Xert Community Forum](https://forum.xertonline.com/t/onboarding-steps-for-xert-trial-users-and-newbies/43314/69)  
With XATA BBP you’d be starting in Build phase due to the target event date.  
I prefer the “freedom to ride” inherent with XATA’s day-by-day choices. Others prefer to follow a predictable schedule. YMMV  
You can also try setting a Goal for Mixed Rouleur and see how those table views compare to the Event forecast. Push the watt gain slider a few clicks past green into yellow or red text warning and see if a viable plan can still be forecast.

---

_[View the full topic](https://forum.xertonline.com/t/confused-by-xfai-setup-achievable-goal-but-no-plan-generated/49232)._
